Distribution towers and hoses, Figure 1-16 – Great Plains ADI445 Operator Manual User Manual

Page 22

Advertising
background image

20

Section 1 Assembly and Setup

Model 2250 Air Drill Implement 160-192M

5/11/05

Great Plains Mfg., Inc.

Distribution Towers and Hoses

Refer to Figure 1-19 for tower mounting locations. Choose
implement configuration to determine tower placement.

1.

Refer to Figure 1-17, install a tower support bracket at
each location using the 1/2” u-bolt (#1), 1/2” lock
washers (#2), and 1/2” nuts (#3)

NOTE: For best results, distribution towers should be
mounted as vertically as possible. A tower that leans
significantly to one side may cause uneven distribu-
tion, particularly when operating on hillsides.

Mounting Tower

Figure 1-17

14546

2.

Position a tower on the bracket and secure with 2 1/2”
x 2 1/2” u-bolts. The bottom of the lower round plate
should be approximately 31 1/2 inches above the
frame members. The tower should be turned so that
inlet tube is pointed toward the center of the imple-
ment. The center tower inlet should face the front of
the implement, see Figure 1-18.

Tower Positioning

Figure 1-18

14499

Frame Leveling Measurement

Figure 1-16

15207

Advertising
This manual is related to the following products: