Assembly, Center frame to tongue – Great Plains FH6800HD Predelivery Manual User Manual
Page 12
564-070Q
01/14/2014
8
FH6000HD
Great Plains Manufacturing, Inc.
Assembly
Center Frame to Tongue
Refer to Figure 6
Note: The tongue will be shipped pre-assembled. See
“Parts Manual” for part numbers and description of
parts.
5.
Remove one 1/2 x 2 hex bolt
and 1/2 lock nut from
both 1 1/2 x 10 pins
on rear of center frame
assembly
.
6.
Attach center wing frame
to center frame assem-
bly
, re-install the 1 1/2 x 10 pins
, 1/2 x 2 hex
bolts
and 1/2 lock nuts to secure.
7.
The valve bracket
may be shipped on tube where
it goes but will have to be removed and orientated as
shown. Attach valve bracket
to center frame
assembly
with 1/2 x 4 1/32 x 5 1/4 u-bolts
, 1/2
lock washers and 1/2 nuts.
8.
Attach sequencing valve
to valve bracket
with
5/16 x 4 hex bolts
, 5/16 lock washers and 5/16
nuts.
9.
Do not hook up rod end of cylinders
to center wing
frame
until hydraulics are completely hooked up
and purge of air. See hydraulic pages 10-12 for
details.
10. Tighten all bolts with lock nuts snug, but do not
torque. The rest of bolts may be tightened to specs,
See “Torque Values Chart” on page 31.
4
3
2
1
2
3
4
5
5
2
6
7
5
8
9
1
Figure 6
Center Frame to Tongue
42994
4
5
1
U
D
F
B
L
R
3
8
2
9
7
6