800 series hydraulics – Great Plains FH6800HD Predelivery Manual User Manual

Page 16

Advertising
background image

12

FH6000HD

Great Plains Manufacturing, Inc.

564-070Q

01/14/2014

800 Series Hydraulics

Refer to Figure 9

Note: Hoses

will be installed through center frame

from hitch at the factory. All the fittings and hoses
will need installed at this time. See 800 Series
Implement Hydraulics (S/N C1289B+) in “Parts
Manual” for part numbers and descriptions of fit-
tings and hoses. See “Hydraulic Connector ID
on page 32 f
or proper fitting torque values.

24. Install orifice plates

to rod end of fold cylinders

before installing the 90 degree elbows

. Attach the

45 degree fittings

, two, to the base end of the fold

cylinders

and one, to base end of the right, lift cyl-

inder

.

25. Attach the 90 degree elbows

to the rod end of fold

cylinders

, base end of left, lift cylinder

, the rear

port, right ports and left, rear port of the sequencing
valve (seven total).

26. Install the 3/4morb x 3/4mjic x 3/4mjic tee

to rod

end of lift cylinders

, Attach the 3/4fjic x 3/4mjic fit-

ting

to front of 3/4morb x 3/4mjic x 3/4mjic tees

.

27. Attach the straight fittings

to the front and front,

left side of the sequencing valve.

28. Attach hoses

to front of sequencing valve.

29. Route proper hoses length from “Parts Manual” as

shown below.

30. Tighten all fittings and hoses, See “Hydraulic Con-

nector ID” on page 32. See “Hose Clamp Assem-
bly
” on page 14 f
or proper clamp mounting.

31. Do not hook up rod end of cylinders

and

until

hydraulics are completely hooked up and purge of
air, See “Hydraulic Purging” on page 15.

10

1

2

4

3

2

5

4

1

5

6

5

7

6

8

10

2

5

Advertising
This manual is related to the following products: