600 series hydraulics – Great Plains FH6800HD Predelivery Manual User Manual

Page 14

Advertising
background image

10

FH6000HD

Great Plains Manufacturing, Inc.

564-070Q

01/14/2014

400-600 Series Hydraulics

Refer to Figure 8

Note: Hoses

will be installed through center frame

from hitch at the factory. All the fittings and hoses
will need installed at this time. See 400-600 Series
Implement Hydraulics (S/N GP-C1504B+) in
“Parts Manual” for part numbers and descriptions
of fittings and hoses. See “Hydraulic Connector
ID
” on page 32 f
or proper fitting torque values.

16. Install orifice plates

to rod end of fold cylinders

before installing the 90 degree elbows

. Attach the

45 degree fittings

to the base end of the fold cylin-

ders

.

17. Attach the 90 degree elbows

to the rod end of fold

cylinders

, base end of lift cylinders

and the rear

port of the sequencing valve (five total).

18. Install the 3/4morb x 3/4mjic x 3/4mjic tee

to rod

end of lift cylinders

,

19. Attach the straight fittings

to the front and both

sides of the sequencing valve.

20. Attach hoses

to front of sequencing valve.

21. Route proper hoses length from “Parts Manual” as

shown below.

22. Tighten all fittings and hoses, See “Hydraulic Con-

nector ID” on page 32. Attach hose clamps and
wraps in positions shown. See “Hose Clamp
Assembly
” on page 14 f
or proper clamp mounting.

23. Do not hook up rod end of cylinders

and

until

hydraulics are completely hooked up and purge of
air, See “Hydraulic Purging” on page 15.

9

1

2

4

3

2

4

2

5

6

5

7

9

2

5

Advertising
This manual is related to the following products: