Install center drags – Great Plains FH6800HD Predelivery Manual User Manual

Page 27

Advertising
background image

Great Plains Manufacturing, Inc.

Assembly

23

01/14/2014

564-070Q

Install Center Drags

61. Pick an area large enough to lay out all the drags,

as they will be arranged when installed. Allow
room to back the implement up to this area, and
once leading chains are attached, pull forward to
extend drags to full length.

Refer to Figure 22 and Figure 21 on page 21
62. Identify the drags to use on the center wing. These

are always two 6-foot sections:

564-043A6FT12ROWDRAG or

564-102A 6 FT 8 ROW DRAG

If one of this part-numbered drags has a side chain
(

in Figure 21 on page 21), place it so that the

chain is to wing center.

63. Lay the drag out flat.

64. Back the implement up to the drag. Raise the arms

up. Leave the wings unfolded.

65. Remove fasteners from free ends of leading

chains

:

802-722C HHCS 9/16-12X3 1/2 GR5 ZNYCR
803-319C NUT HEX TOP LOCK 9/16-12

ZNYCR

Refer to Figure 23
66. For the standard 40

° tooth angle secure each

chain

to the lower holes in the mount (between

the plates), using bolts

and lock nuts

.

Tighten nuts only to Grade 2 torque specification.

For the alternate 22

° tooth angle, use the upper

holes. Using 22

° also requires chain relocation.

See Tooth Angle in “Operator’s Manual” for details.

Figure 22: Center:

Attach Leading Chain

31648

60

5

51

30

5

101

31

30

51
60

Figure 23: Center:

Leading Chain Mount Holes

31756

30

22

°

40

°

30

51

60

Advertising
This manual is related to the following products: