Great Plains NTA2000D Operator Manual User Manual
Page 50

Multi-function Drill Control
38j
Asymmetric Right Tramlining Sequence
For use with a 20ft (6 meter) drill and an 80ft (24 meter) sprayer.
Two seed spouts are closed on the right hand side of the drill on the tramline bouts.
The instrument will beep once at the beginning of each tramline bout, and the display will continue flashing for
the duration of the bout.
Tramline bouts
To use asymmetrical tramlining you
must disconnect the actuator arm at
the left side of the meter assembly
that operates the left feed roll tramline
clutch. This arm will have to be tied so
the “star shaped” teeth on the arm do
not slide over and contact the feed roll
clutch spring (refer to illustration on
page 36). If you have the optional
NTA2000 dual tramline controls kit
Great Plains P/N 890-785C you do
not have to disconnect the actuator
arm.