Hose connection and routing – Great Plains NTA2000D Operator Manual User Manual

Page 79

Advertising
background image

59

9/13/2006

NTA 2000D 148-632M

Great Plains Mfg., Inc.

Hose Connection and Routing

1.

Assemble the seed hoses from the seed
box to the openers. Route each hose from
the center of the box to the end opener. Fol-
low the same manner of routing until the
end, in which the hose from the outside
opening of the seed box will be routed to
the center opener. Use the hose brackets
in routing the hoses from the seed box to
the openers to keep hose up off the drill.

Note: Using the charts on the right, select the
proper row spacing for your drill to determine
the correct hose to use in each position.

Note: When all of the meter outlets are not used
(i.e: 7 1/2”) it is best to leave the outside meters
open.

150mm Spacing

(6 in)

Row

Number

Hose

Length

(inches)

1

96

2

96

3

96

4

96

5

96

6

115

7

115

8

115

9

115

10

120

11

128

12

128

13

128

14

138

15

138

16

146

17

146

18

156

19

166

20

176

Hose Attachment Route

167mm Spacing

(6 1/2 in)

Row

Number

Hose

Length

(inches)

1

96

2

96

3

96

4

96

5

115

6

115

7

115

8

115

9

120

10

128

11

128

12

138

13

138

14

146

15

146

16

156

17

166

18

176

187mm Spacing

(7 3/8 and 7 1/2 in)

Row

Number

Hose

Length

(inches)

1

96

2

96

3

96

4

96

5

115

6

115

7

115

8

120

9

128

10

128

11

138

12

146

13

146

14

156

15

166

16

176

Advertising