Downflow left--side vent and trap, See fig. 14), 58h d v – Carrier DIRECT VENT 4 58HDV User Manual

Page 21

Advertising
background image

21

Elbow Tube Black Rubber

1

/

2

″″ ID (13 mm) & Clamps

(Loose Parts Bag)

AI

R

F

LOW

OFF

ON

AIR

FL

O

W

25--24--69

Single Pressure Switch Detail

Dual Pressure Switch

Tee Trap White PVC
(loose parts bag)

Flexible Tubing Connector,

3

/

16

(5 mm) OD (loose parts bag)

EXHAUS

T

Cut Here

Drain Tube Black,

5

/

8

(16 mm) ID Corrugated

Cut at straight section

Leave room for clamp

WARNING
Move Caps to
top of trap

Relief Tube,
Extension Black Rubber,

3

/

16

(5 mm) ID Cut to fit

(loose parts bag)

INLET

On Some Models
ONLY

Either: The PVC
Drain Tee or a field
supplied 2

(51 mm)

Plastic Cap
Yellow or black

Vent Drain
& Clamps

Rotate downward
5

° to 10°

NOTE: Built--in channel will
be angled 5

° to 10° also.

SIDE VIEW

Coupling & Clamps
(Optional)

Trap Connection

“Clamp ears”
Pointed OUT

Preassemble &
insert into furnace

2

(51 mm) PVC Coupling

Relief Tube
Black Rubber

3

/

16

(5 mm) ID

Drain Tube
Black Rubber

1

/

2

ID (13 mm) & Clamps

Barbed Coupling

1

/

2

(13 mm) OD

(loose parts bag)

PVC Tee

A07767

Fig. 14 -- Downflow Left--Side Vent and Trap

Downflow Left--Side Vent and Trap

(See Fig. 14).

Remove the inducer mounting screws, rotate the inducer 180° and

retighten the inducer screws to 20″ pounds torque.
Disconnect the hoses from the trap assembly, and remove trap and
trap mounting bracket from the blower compartment. Using cover

plate and gasket provided in the loose parts bag, cover the hole

from the burner compartment to the blower compartment and
secure with screws.
Move the caps to the top of the trap and mount the trap externally
to the left side of the unit using the two(2) screws provided.
Cut the

5

/

8

″ (15.9mm) ID corrugated hose as shown above and

fasten the 90° bend end to the trap and fasten the straight end to the

transition drain. Secure both connections with clamps.
Reconnect the

1

/

2

″ (12.7mm) ID drain hose from the vent drain to

the trap and secure with a clamp. In some cases, additional length

will be required for this hose. Use the Black plastic

1

/

2

″ (12.7mm)

OD barbed coupling and a suitable section of

1

/

2

″ (12.7mm) ID

hose to make the connection. Secure all connections with clamps
Connect the

3

/

16

″ (4.8mm) ID relief tube from the small port on the

trap to the top port of the transition as shown in the picture. In

some cases, additional hose length will be needed. Use the clear
plastic

3

/

16

″ (4.8mm) OD flexible tubing connector and a suitable

length of extra

3

/

16

″ (4.8mm) ID hose to make this connection.

Install the vent pipe grommet into the casing
Cut an appropriate length of 2″ (50.8mm) PVC pipe long , enough

to exit the cabinet and connect the vent drain to either:

S

A 2″ (50.8mm) PVC coupling fastened onto the drain tee

Install tee trap into bottom section of tee and glue pipe.
Remove knockout from the side of the furnace casing where drain
tube will exit.
Connect the tee trap and the main drain line exiting the casing as

shown in Fig. 14.
NOTE:

It is recommended that all PVC piping and fitting

connections be fit up and inspected before final cementing. Both
the external trap and the external tee trap must be primed
before operation.
Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may
be installed as shown for future servicing of the vent system.

58H

D

V

Advertising