Warning, Combustible floor installation, Subbase for combustible floor – Carrier DIRECT VENT 4 58HDV User Manual

Page 41

Advertising
background image

41

Note: The three(3) screws in the top panel of the furnace next to the
duct flange MUST be removed to provide serviceability of the

primary heat exchangers in the downflow installation

1. Position plenum through the floor and set the furnace over

the opening in the floor. If necessary, grout around the base
to seal air leaks between the base and the floor.

Combustible Floor Installation

FIRE HAZARD
Failure to

install unit on noncombustible subbase could

result in personal injury, death, and/or property

damage.
Place furnace on noncombustible subbase on

downflow applications, unless installing on non--

combustible flooring. The noncombustible subbase

also must be used on downflow applications in

addition to a coil box installation.

!

WARNING

Subbase for Combustible Floor

NOTE: The three(3) screws in the top panel of the furnace next to

the duct flange MUST be removed to provide serviceability of the
primary heat exchangers in the downflow installation

Note: When using the subbase for combustible floors, the discharge
air duct flanges on the furnace MUST be broken down to provide

proper fit up to the subbase. Use duct pliers to bend the duct flanges
flat onto the furnace casing. DO NOT bend the duct flanges inward

(toward the heat exchangers) as air flow restrictions may occur.
The Subbase for Combustible Floors MUST be used when a
downflow furnace is set on a combustible floor, even when the

furnace is installed on a coil box.

1. Cut the opening in the floor according to Table 9. The hole

in the floor must be cut to the dimensions listed in Table 9
since the base is equipped with locating tabs that center the

base over the opening.

The opening in the base is 1

1

/

4

″ (31.8mm) shorter and 1

1

/

8

(28.6mm) narrower than the recommended size of the opening in
the floor. This is done to maintain clearance between the floor and

the plenum.

2. Fabricate the plenum to the dimensions given in Table 9.

Note that the dimensions given are outside dimensions.

3. Set the base over the opening in the floor, centering it over

the opening. Fasten the base to the floor with screws or nails.
See Fig. 47, 48, and 49.

4. Drop the plenum through the opening in the base. The

flange of the plenum should rest on top of the subbase.

Table 9

Subbases for Combustible Floors Dimensions -- in(mm)

Sub--base for

Combustible Floors

Part Number

Sub--base for Combustible

Floor Dimensions

Opening In Floor

Opening In

Base For Plenum

Typical Plenum

Dimensions

H

*

J*

K**

L

M

N

P

R

S

T

Furnace Only

KGASB0301P01

19

5

/

16

(490.5)

28

3

/

4

(730.3)

18

3

/

16

(462)

16(406.4)

16

1

/

4

(412.8)

18

1

/

4

(463.6)

15 (381)

17

1

/

8

(435.6)

15 (381)

17

1

/

8

(435.6)

KGASB0401P02

22

15

/

16

(582.6)

28

3

/

4

(730.3)

21

13

/

16

(554)

16(406.4)

16

1

/

4

(412.8)

21

7

/

8

(555.6)

15 (381)

19

3

/

4

(501.7)

15 (381)

19

3

/

4

(501.7)

KGASB0801P06

24

11

/

16

(627.1)

28

3

/

4

(730.3)

23

9

/

16

(598.5)

16(406.4)

16

1

/

4

(412.8)

23

5

/

8

(600.1)

15 (381)

22

1

/

2

(571.5)

15 (381)

22

1

/

2

(571.5)

Subbase for Coil Box

KGASB0501P03

19

3

/

8

(181.1)

20

9

/

16

(522.3)

18

3

/

16

(462)

16

1

/

16

(408)

16

1

/

4

(412.8)

18

1

/

4

(463.6)

15 (381)

17

1

/

8

(435.6)

15 (381)

17

1

/

8

(435.6)

KGASB0601P04

23 (284.2)

20

9

/

16

(522.3)

21

13

/

16

(554)

16

1

/

16

(408)

16

1

/

4

(412.8)

21

7

/

8

(555.6)

15 (381)

19

3

/

4

(501.7)

15 (381)

19

3

/

4

(501.7)

KGASB0701P05

24

3

/

4

(628.7)

20

9

/

16

(522.3)

23

9

/

16

(598.5)

16

1

/

16

(408)

16

1

/

4

(412.8)

23

5

/

8

(600.1)

15 (381)

22

1

/

2

(571.5)

15 (381)

22

1

/

2

(571.5)

*

Outside Dimension

**

Base Spacer Side To Side

Conversion: 1 in = 25.4 mm

58H

D

V