Dutchwest direct vent / natural vent gas heater, Vent termination below grade, Vertical (through the roof) vent assembly – Vermont Casting 2466 User Manual

Page 17

Advertising
background image

17

Dutchwest Direct Vent / Natural Vent Gas Heater

30001935

Vent Termination Below Grade

Install Snorkel Kit #7FSDVSKS when it is not possible
to meet the required vent termination clearances of 12”
(305mm) above grade level. The snorkel kit will allow
installation depth of down to 7” (178mm) below grade
level. The seven inches is measured from the center of
the horizontal vent pipe as it penetrates the wall. If the
venting system is installed below grade, a window
well must be installed with adequate and proper
drainage. (Fig. 28)
NOTE:
Be sure to maintain side wall clearances and
vent run restrictions. Refer to Figures 3, 4, 7, and 8.
1. Establish the vent hole through the wall.
2. Remove soil to a depth of approximately 16” (406

mm) below the base of the snorkel. Install a window
well (not supplied). Refill the hole with 12” (305mm)
of coarse gravel and maintain a clearance of at least
4” (102 mm) below the snorkel. (Fig. 28)

3. Install the vent system as described on Pages 14-

17.

4. Be sure to make a watertight joint around the vent

pipe joint at the inside and outside wall joints.

5. Apply high temperature sealant around the inner

and outer snorkel collars. Join the pipes and fasten
the snorkel termination to the wall with the screws
provided.

6. Level the soil to maintain a 4” clearance below the

snorkel.

ST218

install snorkel

12/6/99 djt

Waterproof Seal

Around Pipe

Firestop

Window

Well

Drain

Snorkel

Termination

Cap

4” Clearance

Gravel

ST765

Fig. 28 Snorkel kit installation.

ST219

snorkel detail

12/6/99 djt

Recessed Wall

Firestop

Finishing
Collar

7” Pipe

Wall Plate

Sheet Metal

Screws and

Bracket

Wall Screws

and Anchors

Waterproof

Seal Around

Pipe

ST219

Fig. 29 Use extension brackets to mount snorkel against
recessed wall.

If the foundation is recessed, use extension brackets
(not supplied) to fasten the lower portion of the snorkel.
Fasten the brackets to the wall first, and then fasten
to the snorkel with self-tapping #8 x 1/2” sheet metal
screws. Extend the vent pipes out as far as the protrud-
ing wall face. (Fig. 29)

Vertical (Through the Roof)

Vent Assembly

Note that all vertically terminated installations must in-
clude the restrictor plate included with the stove. Refer
to Figure 8, Page 8.
Make certain the vent system conforms to all other
requirements for vertical termination as specified on
Page 8.
This installation will require you to first determine the
roof pitch and use the appropriate vent components.
Refer to Figures 8 and 9 on Pages 8 and 10.
1. Locate the final position of the stove, observing all

clearances for both the vent and the stove.

2. Plumb to the center of the inner (4”) flue collar from

the ceiling above, and mark that location.

3. Cut the opening:

CFM System: 9³⁄₈” x 9³⁄₈” (240mm x 240mm)

DuraVent System: 10” x 10” (254mm x 254mm)

4. Plumb any additional opening through the roof or

other construction that may be needed. In all cases,
the opening must provide a minimum of 1” (25mm)
clearance to the vent pipe.

5. Place the stove in its final position.
6. Install firestop(s) #7DVFS and Attic Insulation Shield

#7DVAIS as needed. (Fig. 30) If there is a room
above ceiling level, a firestop must be installed on
both the bottom and top sides of the ceiling joists.
If an attic is above ceiling level, an attic insulation
shield must be installed.

7. Install the appropriate roof support and flashing,

making certain that the upper flange of the flashing
base is below the shingles. (Fig. 31)

Advertising