0 assembly instructions – ETS-Lindgren 2171B Boresight Antenna Tower User Manual
Page 21
Assembly Instructions
|
21
5.0 Assembly Instructions
Before connecting any components, follow the safety information
in the ETS-Lindgren Product Information Bulletin included with
your shipment.
This equipment should be installed, operated, and maintained by
qualified personnel.
Stay clear of all moving components on this equipment.
Never stand beneath the carrier, whether moving or stationary.
You will require assistance from two or more team members to assemble the
Model 2171B/2170B.
See the ETS-Lindgren Product Information Bulletin included with your
shipment for information on unpacking and acceptance procedures.
The Model 2171B/2170B Antenna Positioning Tower should be assembled in the
location where it will be used. If movement to another location is required after
assembly, partial disassembly will be required for it to fit through most doorways.