Step 5, Insert mast into base – ETS-Lindgren 2171B Boresight Antenna Tower User Manual

Page 30

Advertising
background image

30

|

Assembly Instructions

Make sure to orient the carrier and mast to the base as shown in Orientation During Assembly on page 23.

S

TEP

5

—I

NSERT

M

AST INTO

B

ASE

Carefully move the mast and carrier into a vertical

position and slide the mast into the base, aligning the

fiber optic connectors on the front of the mast with

access slot on the front of the base.

Replace the two base studs removed in step 2 on

page 25.

Adjust the carrier height by moving the carrier past the

lower limit switch until it stops at rest on the top of

the base.

Advertising