Step 3, Slide carrier onto (main) mast – ETS-Lindgren 2171B Boresight Antenna Tower User Manual

Page 26

Advertising
background image

26

|

Assembly Instructions

Make sure to orient the carrier and mast as shown in Orientation During Assembly on page 23

S

TEP

3

—S

LIDE

C

ARRIER ONTO

(M

AIN

)

M

AST

Place the mast horizontally onto an elevated, stable surface,

such as across two sawhorses.

Carefully slide the carrier onto the mast from the bottom of

the mast. Orient the carrier so that when the mast is inserted

into the base:

The air cylinder is on the same side of the mast as the

fiber optic connectors; and

When the mast is upright, the air cylinder will point

downward.

Advertising