0 operation, Pre-operational checklist – ETS-Lindgren 2171B Boresight Antenna Tower User Manual

Page 47

Advertising
background image

Operation

|

47

7.0 Operation

Before placing into operation, follow the safety information in the

ETS-Lindgren Product Information Bulletin included with your

shipment.

This equipment should be installed, operated, and maintained by

qualified personnel.

Stay clear of all moving components on this equipment.

Never stand beneath the carrier, whether moving or stationary.

The stationary cam link assembly should never be attached to the carrier when

using the boresight.

Pre-Operational Checklist

Verify that the power lines are connected for the tower, controller, and any

other equipment to be used for testing.

Verify the fiber optic cables are connected.

Verify the antenna connected to the boom is securely mounted.

Connect the feed cable to the antenna.

Before moving the carrier on the mast up or down, verify there are no

people standing near the boom.

Advertising