Shutdown, Mounting antennas – ETS-Lindgren 2171B Boresight Antenna Tower User Manual
Page 52
52
|
Operation
S
HUTDOWN
Move the carrier to an accessible height to remove the antenna and confirm the
unit has come to a complete stop. Press the power button on the Model 2090 to
turn it off.
Mounting Antennas
The Model 2171B/2170B accepts antennas with the following mount types:
Stinger-mount boom: Stinger-mount
Optional offset boom: 7/8
–14 thread, 1/4–20 thread
These mount types will maintain the centerline axis during polarization. The
antenna should be mounted on the boom as close to the carrier as possible.
Insert the mounting knobs through the holes on the boom and align the mounting
holes on the antenna with the threaded end of the mounting knobs. Secure the
antenna in place by tightening the threaded knobs into the receptacle mounting
holes on the antenna.