Recommended tools, Parts to assemble, Overview of assembly steps – ETS-Lindgren 2171B Boresight Antenna Tower User Manual

Page 22

Advertising
background image

22

|

Assembly Instructions

Recommended Tools

300 mm adjustable wrench

3/16-in Allen wrench

9/16-in wrench

11/15-in wrench

Work bench or two sawhorses

Medium-sized level

Boresight shown;

antenna not included

Parts to Assemble

These main parts are used to assemble the

Model 2171B/2170B:

Mast

Carrier

Belt

Base

The Model 2171B/2170B ships with a small temporary shipping mast. The

carrier is installed on this small mast and then inserted into the base for

stability during transit. The temporary shipping mast should never be used for

operation.

Overview of Assembly Steps

1. Remove carrier from temporary shipping mast

—see page 25.

2. Remove temporary shipping mast from base

—see page 25.

3. Slide carrier onto (main) mast

—see page 26.

4. Begin belt installation

—see page 27.

5. Insert mast into base

—see page 30.

6. Connect fiber optic cables

—see page 31.

7. Adjust the timing

—see page 33.

8. Finish installing the belt

—see page 35.

9. Adjust belt tension

—see page 40.

Advertising