Laser probe setup – ETS-Lindgren HI-6100 Field Monitor User Manual

Page 20

Advertising
background image

20

|

Assembly and Installation

5.

Connect the AC power cord to the IEC connector on the back of the

HI-6100 Field Monitor. Verify the power supply switch is in the ON

position.

6.

Plug the other end of the power cord into an electrical outlet.

7.

Turn on the battery powered probe(s).

8.

Turn on the power switch on the front panel. It may take several

seconds for the display to appear.

9.

To display the probes attached, press the Find All Probes key on the

main menu of the display screen to see information for all of the

probes.

L

ASER

P

ROBE

S

ETUP

1.

Remove the plastic dust caps from the appropriate DEVICE

INTERFACE CHANNEL located on the back of the HI-6100. Save all

protective caps and covers for future use. Clean transmit and receive

ports using canned dry air.

2.

Remove the dust caps from the probe and follow the instructions on

page 14 to clean the fiber connectors. If extension cables and

bulkhead feedthrough connectors will be used, clean as described.

Connect the fiber optic cable to the selected DEVICE INTERFACE

CHANNEL. Both the FC and the ST connectors are keyed.

3.

Connect the AC power cord to the IEC connector on the back of the

HI-6100. Verify the power supply switch is in the ON position.

4.

Plug the other end of the power cord into an electrical outlet.

5.

Turn on the power switch on the front panel. It may take several

seconds for the display to appear.

6.

To display the probes attached, press the Find All Probes key on the

main menu of the display screen to see information for all of the

probes.

Advertising