Frame fabrication-typeb – Oldcastle BuildingEnvelope ICR-225 User Manual

Page 17

Advertising
background image






14

March 2012

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

I C R - 2 2 5 - I N S T A L L A T I O N M A N U A L

FRAME FABRICATION TYPE “B”

NOTE: Structural silicone glazed vertical mullion is referred to as “SSG Mullion”.

4.1

Measure Rough Opening to determine Frame Width and Frame Height dimensions. Allow ½”

minimum clearance for shimming and caulking around perimeter of frame.

4.2

Cut material to size.

SEE FIGURE 15 for guide.

Material Fabrication Guide

Frame Width

Frame

Height

D.L.O.

Bay Width

at SSG Mull

D.L.O.

Figure 15

Details in this manual reflect the 4 1/2” system. 6” system part numbers and dimensions are

referenced in parentheses ( ) where applicable.

Head and Sill
Head and Sill Face Caps

Verticals and Jambs

Vertical Face Caps

Intermediate Horizontals
Intermediate Horizontals

Horizontal Glass Stops
Horizontal Face Caps
Horizontal Face Caps @ SSG

Frame Width
Frame Width

Frame Height Minus 3 5/16”

Frame Height Minus 4 1/2”

D.L.O. (Screw Spline)
D.L.O. Minus 1/16”

D.L.O. Minus 1/32”

Bay Width Minus 1/16”

D.L.O. Minus 1/16”

Advertising