I C R - 2 2 5 - I N S T A L L A T I O N M A N U A L

OPTIONAL HEAD & SILL REINFORCING

6” SYSTEM DEPTH ONLY

Optional reinforcing sleeves are available with Type “A” systems (head only) and Type “B” systems

(Head & Sill) when end reactions exceed 600 lbs.

Do not pre-install head anchors onto building condition.

B.1

Prior to assembling frame, slide reinforcing sleeves and head anchors into position as follows

SEE

FIGURE 32, page 30:

Type “A” & “B” Head: At head anchor locations or per approved shop drawings

Type “B” Sill: At each vertical or per approved shop drawings

B.2

Attach jambs and vertical mullions to the head and sill members. Refer to

STEP 2.4, page 9 for Type

“A” systems and

STEP 5.2, page 17 for Type “B” systems.

NOTE: Assembly screws for verticals and jambs run through the sill reinforcing sleeves.