I C R - 2 2 5 - I N S T A L L A T I O N M A N U A L

Figure 19

Type "B" Frame Seals

Stagger Clips as shown at

Head and Sill members

Apply sealant to top of

Jamb at inside and exterior

surfaces as shown

ICW-12 Clips (Typical)

ICW-312 Clip at weeps

for incidental water

head installations

NOTE: Additional sealant may be

required along face of vertical to Head

and Horizontal connections. Tool

sealant at these locations to insure

proper seals.

Apply

sealant to

top of SSG

Mullion

Apply sealant to Mullion

along interior and exterior

surfaces of Mullion as shown

ICW-12 (Typical)

ICW-312 at weeps

Apply sealant along face of Mullion and

Shear Block prior to installing Horizontal

Apply sealant at inside and outside

surfaces of Sill at captured

Mullions and Jambs

ICW-12 Clips @

12” O.C. stagger

as shown

Apply sealant

as shown at

SSG Mullion

Apply sealant at

Jambs as shown

FRAME SEALING TYPE “B”

5.5 Seal ends of vertical and horizontal framing members before assembly. See Figure 19.