Zone-plug-bridge-install-typeb – Oldcastle BuildingEnvelope ICR-225 User Manual

Page 25

Advertising
background image






22

March 2012

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

I C R - 2 2 5 - I N S T A L L A T I O N M A N U A L

Figure 24

Zone Plug Installation

Bridge Installation

Figure 25

Seal Zone plug to

form a water tight

seal

ICR-107-01 Mullion (deep pocket)

ICR-110-01 Mullion (shallow pocket)

ICR-108-01 Jambs

ICR-105-01 Bridge

Attach bridges with

(2) FS-202 (#8 X 1/2" PPH)

Cap Seal Fasteners

Bed in sealant

Apply sealant to

top of Horizontal

After Bridge is installed seal joints

between Bridge and Horizontals (Typical)

Install and seal zone plugs at captured verticals as shown in

FIGURE 24 Where there are SSG

verticals, install and seal aluminum bridges per instructions in

STEP 6.5.

ZONE PLUG & BRIDGE IINSTALLATION

6.3

6.4

6.5 SSG Bridge Installation: An aluminum bridge must be installed at each horizontal to vertical connection

when using a SSG mullion. The bridge will be attached to the horizontals using (2) FS-202 #8 x ½” Pan

Head screws. Sealant will be applied to the horizontal member and to the mating surface of the bridge.

Set bridge in place and attach. Tool sealant around the perimeter of the bridge and along the face of the

mullion. Cap seal fasteners. The joint at the face of the bridge to the horizontal must also be sealed. SEE

FIGURE 25,.

Seal perimeter of frame. Care must be taken to marry seals at the corners of the frame. Interior seals

are not required for system performance, but may be necessary for cosmetic purposes. When installing

exterior seal it is recommended that the seal be applied prior to installing face caps. Keep weep holes at

sill clear of sealant. Never apply perimeter seal along outer edge of face cap.

Advertising