Removing the rack doors, Removing the rack doors -7 – Dell PowerVault 715N (Rackmount NAS Appliance) User Manual

Page 11

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Recommended Tools and Supplies

You need the following tools and supplies to install the system in a four-post гаек eabinet:

A #2 Phillips serewdriver

Masking tape or a felt-tip pen, for use in marking the mounting holes to be used

Installation Tasks

Installing a raek kit involves the following tasks:

1

Removing the raek doors

2

Marking the raek

3

Installing the slide assemblies in the raek

3

Installing the inner rails

5

Installing the system in the raek

6

Installing the eable-management arm

7

Replaeing the raek doors

^ NOTE:

The procedures that follow apply to both Dell rack cabinets and rack cabinets not

manufactured by Dell unless Identified as specific to one or the other.

Removing the Rack Doors

See the proeedures for removing doors in the doeumentation provided with your Dell 24-U

or 42-U raek eabinet. If you have a raek eabinet not manufaetured by Dell, refer to the
manufaeturers doeumentation for removing the doors.

/t\ CAUTION: Because of the size and weight of the rack cabinet doors, never

attempt to remove or install them by yourself.

CAUTION: Store the two doors where they will not injure someone if the doors
accidently fall over.

R a c k I n s t a l l a t i o n G u i d e |

1 - 7

Advertising