Mk-101 maintenance – MK Diamond MK-101 User Manual

Page 34

Advertising
background image

34

MK-101

MaiNTeNaNCe

MK-101 is designed with a power transmission V-belt. In order to ensure the MK-101 operates at
peak efficiency, the V-belt should be inspected monthly, and change if the V-belt shows damage
and/or excessive wear.

NOTe: 1. When a new belt is installed, it should be inspected and re-tensioned after the first

forty-eight (48) hours of operation.

BelT iNSPeCTiOiN, aDJSTMeNT aND RePlaCeMeNT

(A)

Remove the Diamond Blade

(B)

Remove the Cutting Head (See

Adjusting the Cutting Head)

(C)

Remove the two top Belt Guard

Bolts

(D)

Remove Belt Guard bottom bolt

(E)

Inspect the Micro-V Belt for

cracks, fraying, separation and

wear. Go to step H if replacement

is required

(F)

Check belt for proper tension. If tension

correct, go to step Q (proper tension

should be 1/8-inch

deflection)

(G)

Loosen the two front motor

mounting bolts. If re-tensioning

only, go to step N

(H)

Loosen the two back motor

mounting bolts

(I)

Loosen the Motor Adjustment Strap

Advertising