Installation checklist, Mounting tools and equipment – Cisco IAD2430 User Manual

Page 40

Advertising
background image

3-4

Cisco IAD2430 Series Integrated Access Devices Hardware Installation Guide

OL-4234-06

Chapter 3 Installing Cisco IAD2430 Series IADs

Mounting Tools and Equipment

Installation Checklist

The Installation Checklist (see

Figure 3-1

) lists the tasks for installing a Cisco IAD. Print a copy of this

checklist and mark the entries as you complete each task. For each Cisco IAD, include a copy of the
Installation Checklist in your Site Log.

Figure 3-1

Installation Checklist

Installation Checklist for site ______________________________________________

Cisco IAD name/serial number _____________________________________________

Mounting Tools and Equipment

Obtain the following tools and parts needed for installing a Cisco IAD2430 series IAD:

Standard flat-blade screwdriver as required for attaching brackets to rack or wall.

Phillips screwdriver for attaching brackets to the IAD.

Mounting brackets and screws for 24-inch rack, if required.

Four telco machine screws for installing the chassis in a rack (use the screw size required by the
rack).

Screws and anchors for wall mounting, if required.

Task

Verified by

Date

Background information placed in Site Log

Environmental specifications verified

Site power voltages verified

Installation site prepower check completed

Required tools available

Additional equipment available

Cisco IAD received

Quick start guide received

Regulatory compliance and safety information received

Information packet, warranty card, and Cisco.com card received

Software version verified

Rack, desktop, or wall mounting of chassis completed

Initial electrical connections established

ASCII terminal attached to console port

Modem attached to console port (for remote configuration)

Signal distance limits verified

Startup sequence steps completed

Initial operation verified

Advertising