Unpacking and inspection – Cisco IAD2430 User Manual

Page 41

Advertising
background image

3-5

Cisco IAD2430 Series Integrated Access Devices Hardware Installation Guide

OL-4234-06

Chapter 3 Installing Cisco IAD2430 Series IADs

Unpacking and Inspection

Eight wood screws or other fasteners for installing the chassis on a wall. An additional starter
screw can be used to facilitate wall-mounting (does not include Cisco IAD2435 IAD).

For Cisco IAD2435 IAD—two number-six, 3/4-inch (M3.5 x 20-mm) screws.

ESD-preventive wrist strap

In addition, you might need the following external equipment:

Console terminal, or personal computer with terminal emulation software

PC running terminal emulation software for administrative access

Modem for remote access

Analog voice RJ-21 cable

Digital voice RJ-48 T1/E1 cable

Serial, RJ-48, or RJ-45 cables for connecting WAN interface cards (WICs) or voice interface cards
(VICs)

CSU/DSU for the serial interfaces

Ethernet switch

Modem for remote configuration

Note

Serial cables use the Cisco 12-in-1 connector on the WAN connection end.

Unpacking and Inspection

Do not unpack the Cisco IAD2430 series IAD until you are ready to install it. If the installation site is
not ready, keep the chassis in its shipping container to prevent accidental damage.

The IAD, cables, and any optional equipment you ordered might be shipped in more than one container.
When you unpack each shipping container, check the packing list to ensure that you received all the
following items:

Cisco IAD2430 series IAD

Power cord

Note

Power cords vary, depending upon local requirements.

RJ-45-to-DB-25 adapter cable (labeled CON)

RJ-45-to-DB-9 adapter cable (labeled AUX)

Rack-mounting brackets for 19-inch rack (one pair) with screws for attaching to chassis

Note

Rack-mount brackets for 19-inch rack, NEBS grounding kit, and chassis guard for
wall-mounting applications are not included with the Cisco IAD2435-8FXS.

Grounding lug and fasteners

Advertising