Discharge chute and controls (joystick, hex shaft) – Cub Cadet Medium Frame 3 Stage User Manual

Page 115

Advertising
background image

Discharge Chute and Controls (Joystick, Hex Shaft)

111

17.

Lift the Worm Gear Assembly out of the Gear Sup-
port.

18.

Slide the bushings washers and the Worm Gear off of
the Gear Shaft. See Figure 10.16.

19.

Swing the Latch Pawl clockwise until there is enough
clearance to remove the Pinion Gear Bushing. See
Figure 10.17.

20.

Remove the Pinion Gear Bushing.

To reassembly the Remote Head:

21.

Install the Pinion Shaft Bushing.

22.

Install the Pinion Gear.

23.

Disengage the Latch Pawl while rotating the Pinion
Gear until the edge of the travel stop is 3/4” from the
edge of the Gear Support Bracket. See Figure 10.18.

Figure 10.16

Figure 10.17

Pinion Gear Bushing

Figure 10.18

Travel stop

Advertising
This manual is related to the following products: