Installing an option board – A&D Weighing AD-4407 User Manual

Page 9

Advertising
background image

AD-4407 Weighing Indicator

Page

7

3.1.5.

Installing an Option board

Caution

Do not remove any screws without the following step.

This is the procedure for the data output board (OP-03, OP-05, OP-07 and OP-08).

Step 1 Remove the power cord from the AC power source.

Step 2 Remove eight hex bolts (one of them is the sealing bolt) from the rear panel.

Step 3 Remove the rear panel carefully as there are cables between the front unit and the

rear panel.

Step 4 Place the option board on the option board space in the rear panel and secure it

with screws.

Step 5 Connect the option cable(s) between the option board and the main board in the

front unit.

OP-03(RS-422/485, Relay output)

J2 - Main board J2

J3 - Main board J5

OP-05(RS-232C, I/O)

J5 - Main board J5

OP-07(4-20mA Analog output)

J2 - Main board J2

J5 - Main board J5

OP-08(RS-232C, CL, I/O)

J5 - Main board J5

Step 6 Pass the interface cable through the cable clamper to the external equipment.

Step 7 Connect the interface cable to the option board connector or terminal block.

Step 8 Place the rear panel on the front unit, and secure using the bolts removed in Step 2.

Step 9 After powered on, enter the F-functions and store the F30's parameters.

For OP-03, OP-05 and OP-08, there are parameters in “serial”.

For OP-07, there are parameters in “analog”.

3. Installation and Precaution

Advertising