MODBUS

Communication

GF-114

Hardware Setup & Installation

USER MANUAL

OMM-0035_0C

05/18/12 AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

Page

67 of 200

CAUTION

The C-More Boiler Controller Printed Circuit Boards contain

electronic components that are sensitive to electrostatic discharge

(ESD). Prior to performing the following steps, put on an anti-static

wrist strap and connect the clip lead to earth ground. Failure to

observe this precaution may result in permanent damage to on-

board ESD-sensitive components.

4. Put on an anti-static wrist strap and attach the clip lead to earth ground.
5. From the back of the Panel Assembly (Figure 4-9), locate the RS485 DIP switches on the

PMC Board.

6. Refer to Figure 4-10 and set the “TERM” switch to the ON (Up) position.
7. Set the BIAS2 and BIAS1 switches to the ON (Up) position.
8. After the DIP switches have been set, reposition the Front Panel Assembly on the

chassis and secure it in place with the four screws.

FRONT PANEL

SCREWS (4 PL)

THE C-MORE CONTROLLER MODEL SHOWN WITH A

HORIZONTAL PANEL CONTROL LAYOUT IS USED ON KC1000

BOILERS.

BENCHMARK BOILERS UTILIZE C-MORE CONTROLLERS WITH

A VERTICAL PANEL CONTROL LAYOUT.

NOTE:

Figure 4-8: C-More Control Panel - Front View