10 start sequence – AERCO BMK 1500-2000 User Manual

Page 46

Advertising
background image

Benchmark 1500 - 2000 Boilers

CHAPTER 3 – OPERATION

Page 46 of 188

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0097_0D

Ph.: 800-526-0288

GF-142

Menu Item Display

Available Choices or Limits

Default

Minimum

Maximum

Err Threshold

1

9

5

SSD Temp Format

Degrees

Points

Degrees

BST Upld Timer

0

9999 sec

0

3.10 START SEQUENCE

When the Control Box ON/OFF switch is set to the ON position, it checks all pre-purge safety
switches to ensure they are closed. These switches include:

• Safety Shut-Off Valve (SSOV) Proof of Closure (POC) switch
• Low Water Level switch
• High Water Temperature switch
• High Gas Pressure switch
• Low Gas Pressure switch
• Blower Proof switch
• Blocked Inlet switch

If all of the above switches are closed, the READY light above the ON/OFF switch will light and
the unit will be in the Standby mode.

When there is a demand for heat, the following events will occur:

NOTE

If any of the Pre-Purge safety device switches are open, the
appropriate fault message will be displayed. Also, the appropriate
messages will be displayed throughout the start sequence, if the
required conditions are not observed.

1.

The DEMAND LED status indicator will light.

2.

The unit checks to ensure that the Proof of Closure (POC) switch in the downstream
Safety Shut-Off Valve (SSOV) is closed. See Figure 3-3 for SSOV location.