Parts & assembly sheet – Golden Lighting 1089-5 RSB-PRL User Manual

Page 2

Advertising
background image

For Customer Service, contact the place of purchase to arrange for replacement parts.

9. Slip Canopy Loop Collar (H) over the chain, then do the
same with Canopy (G).

10. When ready to complete the installation Use the other
chain connector and attach the other end of the chain to
Canopy Loop (F) and close the chain connector.

11. Make sure the weight of the chandelier will be supported
by the chain-not the electrical wire.

* You may now install the fixture.

6. By measuring, determine the correct number of links

needed for proper hanging height. Use a pair of pliers to

open one link of Chain (K). Remove the excess Chain (K)

and discard it.

7. Use one Chain Connector (L) to attach one end of the

chain to the Top Loop (J) and close the chain connector.

8. Feed the fixture wires through the Chain (every three links)

and pull the wires until taut.

Fig 2


Note: Complete these remaining steps after the fixture is
hung.

12. Turn the Bottom Threaded Rod (S) into the coupling at
bottom center of Frame (M).

13. Slide the Bottom Cover (T) over the Bottom Threaded
Rod (S), secure in place with the Hex Nut (P) until tight. Slide

the Bottom Cap (U) over the Bottom Threaded Rod (S),

secure in place with the Finial (V) until tight.

14. Slide Glass Shade (W) over the socket of Frame (M) and

secure Glass Shade (W) by threading Socket Ring (X) onto

socket of Frame (M) until tight.

15. Install the light bulb (not provided) in accordance with the

fixture's specifications.

(DO NOT EXCEED MAXIMUM WATTAGE RATING)

PARTS & ASSEMBLY SHEET

Fixture Name: Pemberly Court 1089-5 RSB-PRL

C

D

Advertising