Golden Lighting 3711-17 CB User Manual

Parts & assembly sheet, Parts list

Advertising
background image

2488,3711-FM PartsInstallaton_20120313Rev.xls

Part Needed

Quantity

Part Needed

Quantity

Reason why

( missing, scratched, broken glass, bent, bad finish)

Comments

Nipple

1ea

1/8-IP*H160mm

Mounting Screws

2ea

5/32-IP*65

Metal washer &

plastic washer

2ea ∅1-1/2"*H2mm

Hex Nut

2ea

5/32-IP*H3mm

Mounting Strap

1ea W3-

7/8"*E1"*10mm

Deco Nut

1ea

1/8-27-IP*H32mm

Wire connectors

3ea

P3

Hex Nut

1ea

1/8-IP*H4mm

Bottom cap

1ea
∅2-1/4"*H36mm

Mounting Screws

2ea

8#32-IP*1"

PARTS & ASSEMBLY SHEET

Fixture Name: Rockefeller 2488-17 FI & 3711-17 CB

This fixture assembled PO:__________ Date: ________

Notice:

Please review the parts listing and check for all parts before assembling the fixture. If any parts are

missing or damaged, please note onthis sheet and contact the place of purchase to arrange for replacement

parts.

PARTS LIST

Company Name:_______________________Co. Account #:_____________
to be filled out by retailer

For Customer Service, contact the place of purchase to arrange for replacement parts.

F

IXTURE

A

SSEMBLY

I

NSTRUCTIONS

Read and review installation instruction sheet

before assembling the fixture.

2488-17 FI & 3711-17 CB

1. Thread the Nipple (K) into the Ceiling pan (J)
coupler and secure with Hex nut attached.

2. Install the light bulbs in accordance with the
fixture's specifications.

3. Place the Glass shade (L) over the Ceiling pan
(J) allowing the Nipple (K) to protrude through the
bottom hole in the glass. Place the Plastic washer
and Metal washer over the Nipple (K) tighten with
Hex Nut (I), slide Bottom cap (J) over Nipple (K)
and tighten with Finial (K).

(DO NOT EXCEED MAXIMUM WATTAGE RATING!)

Fig 1

NOTE: I

NSTALL THE GLASS ASSEMBLY

AFTER THE FIXTURE IS HUNG.

Advertising
Table of contents