Installation instruction ch-1 – Golden Lighting 4002-M1L RSB User Manual

Page 2

Advertising
background image

INSTALLATION INSTRUCTION CH-1

For Chandelier Light Fixtures (Rev.07-02-07)


HANGING THE FIXTUREFig.1

1. Shut off the power at the circuit breaker and remove

old fixture from ceiling, including the old crossbar.

2. Carefully unpack new fixture and lay all the parts

on a clear surface.

3. Thread nipple (C) into loop (F) until snug.
4. Thread other end of nipple (C) with loop attached

into crossbar (D) until snug.

5. Place lock washer (B) over of nipple protruding

through crossbar and thread hex nuts (A) onto
nipple until tight.

6. Take this crossbar assembly and mount to ceiling

junction box with junction box screws (E) .Tighten
screw securely with screwdriver.

7. Use a pair of pliers to open one end link (I) of the

chain provided, and connect to the fixture loop (J).
Close the link.

8. By measuring, determine correct number of links

needed for proper hanging height. Using pliers
disconnect and discard remaining chain.

9. Lace the fixture wires through the chain.
10. Slip loop collar (H) over the chain, then do the same

with the canopy (G).

11. Open the other end link (I) of the chain and hang

the fixture on the loop at the ceiling. Close the link.

12. Feed the fixture wires through the loop (F), and

nipple (C) and pull until taut.

CONNECTING THE WIRES (Fig.2)

13. Take the black wire from the ceiling junction box

and the smooth wire leg from the fixture and twist
bare ends together. Twist wire connector onto end
of wires until snug.

14. Repeat same process with white junction box wire

and ribbed wire of fixture.
NOTE: Twist wires together in the same direction
you twist the wire connector onto wires.

15. If your junction box has a grounding wire (green or

bare copper), attach this wire and the bare copper
wire from the fixture together as in step 13. If
junction box has no ground wire, attach the bare
copper fixture wire to the junction box with a screw.

16. Tuck these wire connections neatly into the ceiling

outlet box and then raise the canopy (G) all the way
to the ceiling. Raise the loop collar (H) and thread
onto ceiling loop protruding through canopy.

17. Install the light bulbs in accordance with the

fixtures specifications.
NOTE: DO NOT EXCEED THE SPECIFIED
WATTAGE.
Your installation is now complete. Turn power on at
to the junction box & test the fixture.

CSKLG003

WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER

Advertising
This manual is related to the following products: