PARTS & ASSEMBLY SHEET

Fixture Name: Accurian 7158-9 PW/RBZ

Fig 2

3. Slide the Decorative Rods (R) into the bracket on

Arms (V),and tighten the Screws (U) with Hex Key (O)

(See Detail: A-A")

4. Insert the Decorative Rods (R) into the holes on Top

cap housing (M). Turn housing to one side to allow

easier access, turn back to secure rods in place

5. By measuring determine correct number of links

needed for proper hanging height. Use a pair of pliers

to open one link of the Chain (K) then remove the

excess Chain (K) and discard it.

6. Use one chain connector (L) to attach one end of the

chain to the Top loop (J) and close the chain connector.

7. Feed the fixture wires through the Chain (every three

links) and pull the wires until taut.

8. Slip Canopy loop collar (H) over the chain, then do

the same with the canopy (G).

9. When ready to complete the installation Use the

other chain connector and attach the other end of the

chain to the canopy loop (F) and close the chain

connector.

10. Make sure the weight of the chandelier will be

supported by the chain-not the electrical wire.

* You may now install the fixture. Note: Complete

these remaining steps after the fixture is hung.

11. Slide Glass Shade (P) onto Threaded Socket (Q).

and secure the Glass Shade (P) by using Socket Tool (W)

to thread Socket Ring (N) to Socket tightly.

12. Install the light bulbs in accordance with the

fixture's specifications.

(DO NOT EXCEED MAXIMUM WATTAGE RATING) )