Golden Lighting 8106-BA1 CDB User Manual

Parts & assembly sheet, Parts list

Advertising
background image

Circular strap

Mounting
screws

Wire
connencors

1ea Φ102*1.5tmm

4ea 8/32T*1-1/4"L

3ea Orange

Hex nut

Deco nut

Green screw

2ea Φ9*3.5tmm

2ea Φ12*10hmm

1ea Φ9*10mm

Part Needed

Quantity

Part Needed

Quantity

Reason why

( missing, scratched, broken glass, bent, bad finish)

Comments

Notice:

Please review the parts listing and check for all parts before assembling the fixture. If any

parts are missing or damaged, please note onthis sheet and contact the place of purchase to
arrange for replacement parts.

PARTS LIST

Company Name:_______________________Co. Account #:_____________
to be filled out by retailer

PARTS & ASSEMBLY SHEET

This fixture assembled PO:__________ Date: ________

Fixture Name: Torbellino 8106-BA1 CDB

F

IXTURE

A

SSEMBLY

I

NSTRUCTIONS

For Customer Service, contact the place of purchase to arrange for replacement parts.

NOTE: I

NSTALL THE GLASS ASSEMBLY

AFTER THE FIXTURE IS HUNG.

1. Place the Glass Shade (F)over the Socket (G).

2.Holding the Glass Shade (F), place the Socket

Washer (I)over the Threaded Socket (G).

3. Secure Glass Shade (F) and Socket Washer (I)

by threading the Socket Ring (H) onto the Threaded

Socket (G) until tight.

4. Install the light bulb in accordance with the

fixture's specifications.

(DO NOT EXCEED MAXIMUM WATTAGE RATING!)

Fig 1

8106-BA1 CDB

Read and review installation instruction sheet
before assembling the fixture.

D

E

I

F

G

H

Advertising