Golden Lighting 9106-BA2 PW User Manual

Parts & assembly sheet, Parts list

Advertising
background image

9106 PartsInstallation-121208.xls

Circular Mounting

Strap

Mounting screw

Mounting screw

1ea Φ4"*H1.2mm

2ea 8/32-IP*1"

2ea 5/32-IP*1"

Hex nut

Wire connnector

Deco nuts

2ea 5/32-IP*H3mm

3ea A3 Orange

2ea 5/32-IP*H9mm

Part Needed

Quantity

Part Needed

Quantity

Reason why

( missing, scratched, broken glass, bent, bad finish)

Comments

Fig 1

9106-BA2 PW

Read and review installation instruction sheet before

assembling the fixture.

F

IXTURE

A

SSEMBLY

I

NSTRUCTIONS

For Customer Service, contact the place of purchase to arrange for replacement parts.

NOTE: I

NSTALL THE GLASS ASSEMBLY AFTER

THE FIXTURE IS HUNG.

1. Slide the Glass Shade (K) over Socket (G) and secure it by
threading the Socket Ring (I) onto the Threaded Socket (G)
until tight.

2. Install the light bulbs in accordance with the fixture's
specification.

(DO NOT EXCEED THE MAXIMUM WATTAGE RATING!)

PARTS LIST

Company Name:_______________________Co. Account #:_____________

below to be filled out by retailer

Fixture Name: Taylor

9106-BA2 PW

PARTS & ASSEMBLY SHEET

This fixture assembled PO:__________ Date: ________

Notice:

Please review the parts listing and check for all parts before assembling the fixture. If any parts are missing or

damaged, please note on this sheet and contact the place of purchase to arrange for replacement parts.

G

K

I

Advertising
This manual is related to the following products:
Table of contents