Heli-Max HMXE0250 User Manual

Page 11

Advertising
background image

11

8. Check the two linkages and verify they are 42mm. Install

the two linkages onto the flybar control arm and the washout
arm as shown above. Temporarily install the 4mm main blade
bolts into the blade grips. Do not tighten at this time.

TAIL BOOM AND GEARBOX ASSEMBLY

Bag 8 Contents: Tail Boom, Tail Boom Supports, Tail Rotor
Pushrod, Antenna Tube

Bag 8-1 Contents: Torque Tube

Bag 8-2 Contents: 3x16mm SHCS, 3x10mm SHCS, 3mm
Nylon Lock Nuts

1. Insert the torque tube into the tail boom. If the O-rings

do not slide easily, apply a small amount of dishwashing
soap to the O-rings.

2. Remove the left side of the tail rotor gearbox and insert

the right side into the boom as shown above. Please notice
there are two holes on one end of the tail boom. This is the end
where the tail gearbox attaches. Make sure the alignment tab
molded in the tail rotor gearbox halves line up with the hole in
the tail boom. Install the left side of the tail rotor gearbox.

42mm

(

S

ketch not to

s

c

a

le)

Advertising