Commissioning and startup -28, 1 check the installation prior to startup, 2 heater startup – Reznor UDAS Unit Installation Manual User Manual

Page 26: 0 commissioning and startup

Advertising
background image

Page 26

9.0 Commissioning

and Startup

Check to be sure that all screws used to hold shipping brackets were re-

installed in the heater cabinet.

Check suspension. Unit must be secure and level.

Check clearances from combustibles. Requirements are in Paragraph 4.1.

Check vent system to be sure that it is installed according to the

instructions in the appropriate Vent Installation Manual as listed in

Paragraph 2.2.

Check piping for leaks and proper gas line pressure. Bleed gas lines of

trapped air. See Paragraph 6.1.

Check electrical wiring. Be sure all wire gauges are as recommended.

A service disconnect switch should be used. Verify that fusing or circuit

breakers are adequate for the load use.

Check polarity. Verify that line voltage exists between the black “L1” and

earth ground.

If installed in California, verify that California Warning Label is displayed.

WARNINGS

For your safety, read before operating. If you do not follow

these instructions exactly, a fire or explosion may result

causing property damage, personal injury, or loss of life.

• This appliance does not have a pilot. It is equipped with an

ignition device which automatically lights the burner. Do not try

to light the burner by hand.

• Before operating, smell all around the appliance area for gas.

Be sure to smell next to the floor because some gas is heavier

than air and will settle on the floor.

WHAT TO DO IF YOU SMELL GAS

• Do not try to light any appliance.

• Do not touch any electrical switch; do not use any phone in

your building.

• Leave the building immediately.

• Immediately call your gas supplier from a phone remote from

the building. Follow the gas supplier’s instructions.

• If you cannot reach your gas supplier, call your fire department.

• Use only your hand to turn the gas control ON/OFF knob on

the gas valve. Never use tools. If the valve ON/OFF knob will

not turn by hand, do not try to repair it. Call a qualified service

technician. Force or attempted repair may result in a fire or

explosion.

• Should overheating occur, or the gas supply control system fail

to shut off the flow of gas, turn off the manual gas valve to the

appliance before shutting off the electrical supply.

• Do not use this appliance if any part has been under water.

Immediately call a qualified service technician to inspect the

appliance and to replace any part of the control system and any

gas control which has been under water.

9.1 Check the installation prior to startup:

9.2 Heater Startup:

Advertising
This manual is related to the following products: