Ditch Witch JT1220 User Manual

Page 113

Advertising
background image

Conduct a Bore - 112

JT1220 Mach 1 Operator’s Manual

Remove Pipe

CMW

8.

Break rear joint.

•

Engage rear wrench.

•

Slowly rotate spindle counterclockwise until joint is loosened. Do not fully unscrew joint.

•

Disengage rear wrench.

•

Move carriage back until front end of pipe is positioned inside front end of pipe box.

•

Rotate spindle counterclockwise until saver sub is unscrewed from pipe.

•

Stop rotation and move carriage to back of frame.

9.

Ensure pipe box is positioned correctly.

10. Load pipe into pipe box.

11. Attach saver sub to next pipe.

•

Move carriage forward until saver sub touches pipe.

•

Rotate spindle to screw onto pipe. Slowly tighten joint to full machine torque.

12. Disengage front wrench to release pipe.

Manual Pipeloader Controls

Automated Pipeloader Control

•

Move shuttle under pipe box.

•

Release grippers and raise lift arms to
place pipe in box.

•

Lube front threads.

•

Press resume. Green control cycle light
will come on.

•

Shuttles will retract, front threads will be
lubed, grippers will release pipe, pipe
lifters will raise until pipe is off shuttles,
and then green control cycle light will
flash.

Advertising