Ditch Witch JT1220 User Manual

Page 30

Advertising
background image

JT1220 Mach 1 Operator’s Manual

Controls - 29

Left Control Console

CMW

6.

Pipe lift switch

To raise, press top.

To lower, press bottom.

7.

Pipe shuttle switch

To move toward pipe box,
press top.

To move toward spindle,
press bottom.

8.

Pipe gripper switch

To close, press top.

To open, press bottom.

9.

Pipe lubricator switch

To fill applicator at back of
pipeloader, press top.

To apply joint compound to
threads at wrenches, press
bottom.

Item

Description

Notes

c00ic150h.eps

Advertising