Unload – Ditch Witch JT1220 User Manual
Page 90
JT1220 Mach 1 Operator’s Manual
Transport - 89
Haul
CMW
Unload
With Tiedown Kit
1.
Lower ramps.
2.
Remove tiedowns.
3.
Start drilling unit engine.
4.
Raise stabilizers.
5.
Move drilling unit forward until track meets chock.
6.
Raise drill frame.
7.
Slow engine to low throttle and slowly back unit down trailer or ramps.
Without Tiedown Kit
1.
Lower ramps.
2.
Remove tiedowns.
3.
Start drilling unit engine.
4.
Raise stabilizers.
5.
Raise drill frame.
6.
Slow engine to low throttle and slowly back unit down trailer or ramps.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE:
•
Load and unload trailer on level ground.
•
Ensure trailer wheels are blocked.
•
Attach trailer to vehicle before loading or unloading.