Ditch Witch JT1220 User Manual

Page 74

Advertising
background image

JT1220 Mach 1 Operator’s Manual

Prepare - 73

Plan Bore Path

CMW

Pipe-By-Pipe Bend Limits

Pipe

(C)

Forward (B)

Deflection (A)

Pipe

(C)

Forward (B)

Deflection (A)

1

10 ft 0 in (3.0 m)

0 ft 6 in (0.1 m)

10

85 ft 6 in (26.1 m)

44 ft 1 in (13.4 m)

2

19 ft 10 in (6.1 m)

1 ft 11 in (0.6 m)

11

90 ft 11 in (27.7 m)

52 ft 6 in (16 m)

3

29 ft 7 in (9.0 m)

4 ft 3 in (1.3 m)

12

95 ft 6 in (29.1 m)

61 ft 5 in (18.7 m)

4

39 ft 0 in (11.9 m)

7 ft 6 in (2.3 m)

13

99 ft 3 in (30.3 m)

70 ft 8 in (21.5 m)

5

48 ft 1 in (14.6 m)

11 ft 8 in (3.6 m)

14

102 ft 0 in (31.1 m)

80 ft 3 in (24.5 m)

6

56 ft 9 in (17.3 m)

16 ft 8 in (5.1 m)

15

103 ft 11 in (31.7 m)

90 ft 1 in (27.5 m)

7

64 ft 11 in (19.8 m)

22 ft 5 in (6.8 m)

16

104 ft 10 in (31.9 m)

100 ft 0 in (30.5 m)

8

72 ft 5 in (22.1 m)

29 ft 0 in (8.8 m)

16.5

105 ft 0 in (32 m)

105 ft 0 in (32 m)

9

79 ft 4 in (24.2 m)

36 ft 3 in (11 m)

Pipe 10 is illustrated.

Advertising