Entry pitch, Minimum setback – Ditch Witch JT1220 User Manual

Page 75

Advertising
background image

Prepare - 74

JT1220 Mach 1 Operator’s Manual

Plan Bore Path

CMW

Entry Pitch

Entry pitch is the slope of the drill frame compared with the slope of the ground. Determine entry pitch one
of two ways:

1.

With Pitch Beacon

•

Lay pitch beacon on the ground and read
pitch.

•

Lay pitch beacon on drill frame and read pitch.

•

Subtract ground pitch from drilling unit pitch.

2.

With Measurements

•

Measure from the ground to front end of drill
frame (H1).

•

Measure from the ground to back end of frame
(H2).

•

Subtract (H1) from (H2). Record this number.

•

Measure the distance between front and back
points (C).

•

Divide (H2-H1) by (C), then multiply by 100.
This is your pitch.

Minimum Setback

Setback is the distance from the entry point to where
pipe becomes horizontal (B1).

IMPORTANT: A shallow entry pitch (A1) allows you
to reach horizontal sooner and with less bending.
Increasing entry pitch (A2) makes bore path longer
and deeper.

NOTICE: If setback is too small (B2), you will
exceed bend limits and damage the pipe.

Advertising