Working under drilling unit – Ditch Witch JT1220 User Manual

Page 164

Advertising
background image

JT1220 Mach 1 Operator’s

Manual

Service - 163

Service Precautions

CMW

Working Under Drilling Unit

Before working under area of drilling unit supported by a stabilizer, make sure drilling unit is parked on
hard surface.

1.

Remove cylinder locks from storage at rear of pipe box and place over extended cylinder rods (shown)
with curved ends toward stabilizer shoes.

2.

Raise stabilizers to lower unit until load is supported by cylinder locks.

Before working under raised drill frame, support front and back of drill frame with jack stands or
equivalent brace capable of supporting the weight of the unit.

Crushing weight could cause death or serious injury. Use

proper procedures and equipment or stay away.

Advertising