Working under drilling unit – Ditch Witch JT1220 User Manual
Page 164
Advertising
JT1220 Mach 1 Operator’s
Manual
Service - 163
Service Precautions
CMW
Working Under Drilling Unit
Before working under area of drilling unit supported by a stabilizer, make sure drilling unit is parked on
hard surface.
1.
Remove cylinder locks from storage at rear of pipe box and place over extended cylinder rods (shown)
with curved ends toward stabilizer shoes.
2.
Raise stabilizers to lower unit until load is supported by cylinder locks.
Before working under raised drill frame, support front and back of drill frame with jack stands or
equivalent brace capable of supporting the weight of the unit.
Crushing weight could cause death or serious injury. Use
proper procedures and equipment or stay away.
Advertising