14 Commissioning

i

At the time of commissioning, complete all relevant

sections of the Benchmark Checklist located on the

inside back pages of this document

• Check that the differential breaker is installed.

• Check that the hydraulic and electrical connections are correct.

• Check that the filter on the heat pump return is installed.

• Check the airtightness of the connections.

• Open all the hydraulic circuits’ valves.

14.1 filling the glycol circuit

b

Warning! Do not dispose of glycol into drains and the

environment.

b

We recommend that you use propylene glycol

enriched with corrosive inhibitors.

• Mix 1 part propylene glycol with 2 parts water. This 30%

mixture ensures antifreeze protection down to an exterior

temperature of -15 °C.

• Use an antifreeze test kit to ensure accurate dosing.

• Make sure that the hydraulic circuit is purged.

• In order to drain the glycol circuit after filling, use a fill pump.

• Put the heat pump circuit under pressure between 1.5 and 2 bars.

i

The level of glycol may decrease during the first month

following the commissioning of the installation. It may

also vary in accordance with the outdoor temperature.

Any residue of glycol solution should be kept in an appropriate

container to be re-used for the next filling.

• Ensure any leftover glycol solution is left with the end user and

retained in a safe place.

14.2 Activating the heat pump

e

Make sure that all the electrical connections have

been made.

b

Make sure that the setting for the maximum temperature

at heating flow is compatible with the installation.

• Position the circuit breaker located on the electrical circuit box

and connected to the heat pump to the ON position.

The main screen for the command unit is displayed.

• See the chapter "Example installation" to enter all the settings

corresponding to your installation.

14.3 Activating the options

• See the instructions for each option to activate them and enter

their settings.

14.4 Heating system test

• Ensure that there is a heating demand to the control unit. In

the case of a multi-zone configuration, perform the test zone

by zone and ensure that the appropriate zone gets warmer.

• Ensure that all the heating circuit’s thermostatic valves are

open.

• Balance the heat emitters, if necessary.

15 Specific adjustment

15.1 Adjusting the heating circuit

b

The maximum heating output temperature must be

adjusted in accordance with the characteristics of

your installation.

b

Ensure that the heating curve setting is compatible

with the installation.

b

Make sure that the functioning mode for the boiler's

circulator is not in permanent mode, but synchronised

with heating demand (with the room thermostat).

2

4

3

1

Key

1 Speed I

2 Speed II

3 Speed III

4 Speed selector

• Turn the circulator's speed selector to choose speed I.

• Open all the thermostatic valves on the radiators to the

maximum.

• Adjust the temperature to the maximum on all the room

thermostats in your home.

• Activate your installation. The circulator should start.

• Wait 10 to 15 min and measure the difference in temperature

between flow and return of the water in the installation.

The difference should be:

- for the Glow-worm hydraulic model < 5°C,

- for a direct underfloor heating < 7°C,

- for a low-temperature radiator < 15°C.

• If the difference exceeds the indicated values, select a higher

speed.