Introduction, 6 - 2.5 hydraulic and refrigerant schematic – Glow-worm Clearly Heat Pumps Envirosorb2 User Manual

Page 8

Advertising
background image

0020117819_00 - 01/11 - Glow-worm

- 6 -

2.5

Hydraulic and refrigerant schematic

9

10

11

12

14

15

16

17

19

20

22

23

21

18

24

1

3

2

4

5

6

7

A

C

13

8

B

Key

1 fan (1 fan for the 7 kW model, 2 fans for the 12 and 15 kW models)

2 Air input temperature sensor

3 Tubular heat exchanger

4 Temperature sensor for the tubular heat exchanger

5 4-way cycle inversion gate

6 Temperature sensor for compressor suction

7 Silencer

8 Expansion vessel (in this position for the 8 kW model)

9 Automatic purge vent for the heat pump circuit

10 Water flow detector for the heat pump circuit

11 Circulator for the heat pump circuit

12 Safety valve for the heat pump circuit

13 Expansion vessel (in this position for the 12 and 15 kW models)

14 flow temperature sensor for the heat pump

15 Return temperature sensor for the heat pump

16 Draining valve for the heat pump circuit

17 Plate to plate exchanger

18 Pre-expansion temperature sensor

19 Anti-slugging bottle

20 Rotary compressor

21 Liquid tank

22 Silencer

23 Compressor discharge temperature sensor

24 Electronic expansion unit

A Heat pump return

b Heat pump flow

C Evacuation from the safety valve to a container for recovering glycol

water

INTRODUCTION

Advertising