4 flue and appliance preparation – Glow-worm Ultimate 100FF User Manual

Page 13

Advertising
background image

13

221966B

4.1 Unpacking

Open the carton, check the items supplied against the boiler
pack contents list on the flap, see diagram 4.1.

4.2 Flue Position and Length

Determine flue applications, length and terminal position before
starting.

Refer to diagram 4.2 or 4.3.

NOTE: If a longer flue duct is required DO NOT extend the
ducting.

A 1, 2 or 3metre flue system and terminal MUST be used, for the
100FF and 1 or 2 metre only for the 120FF.

NOTE: If required, an optional Wall Liner Kit, part No.452481,
is available, complete with fixing instructions.

4.3 Flue Preparation

All flue assemblies are designed for internal installation (optional
wall liner is required), given that there is sufficient clearances
opposite to the flue for the installation of the flue.

If there is insufficient clearance the flue can be installed from
outside.

Diagram 4.3

6854

Diagram 4.1

4792

CARTON

Standard Flue terminal illustrated.

MOUNTING
BRACKET

INSTRUCTIONS

LOOSE
ITEMS PACK

BOILER

WALL
TEMPLATE

'S'

SIDE FLUE LENGTHS

Distance S = External wall face to boiler case

STD.

81mm to 346mm

1M

81mm to 830mm

2M

81mm to 1830mm

*3M

81mm to 2830mm *100FF ONLY

Diagram 4.2

4275

Standard Flue terminal illustrated.

REAR FLUE LENGTHS

Distance R = Wall thickness

STD.

75mm to 438mm

1M

75mm to 928mm

2M

75mm to 1928mm

*3M

75mm to 2928mm *100FF ONLY

'R'

For a wall thickness up to 300mm, provided that there is
sufficient space and the optional wall liner kit is used the flue can
be fully installed from the inside.

For a wall thickness of over 300mm the external flue hole will
need to be made good from the outside. This applies also if you
use the flue kit without the optional kit, irrespective of wall
thickness.

4 Flue and Appliance Preparation

Advertising
This manual is related to the following products: