5 boiler installation – Glow-worm Ultimate 100FF User Manual

Page 18

Advertising
background image

18

221966B

5.3 Water Circulation System

Complete the water connections to the boiler.

Fill, vent and flush system.

Check for any leaks and put right.

5.4 Safety Valve Discharge

Fit a suitable discharge pipe to the safety valve and route it
outside the building so that any discharge can be seen but will
not cause injury to person, damage to property or any electrical
installation.

5.5 Gas Connection

Make the gas connection to the Rc

1

/

2

in gas service cock, see

diagram 5.5.

Check for leaks using a suitable leak detection fluid.

The whole of the gas installation, including the meter, should be
inspected, tested for soundness and purged in accordance with
the current issue of BS6891 and in IE the current edition of I.S.
813 "Domestic Gas Installations".

Diagram 5.5

Diagram 5.3

CLEAR

RED

FLUE HOOD
SECURING
SCREW (4)

FAN SECURING
SCREWS

FAN
ASSEMBLY

AIR PRESSURE
SENSING PIPES

CLEAR

ELECTRICAL
CONNECTIONS

Diagram 5.4

FLUE HOOD
SECURING SCREWS (4)

FAN
SECURING
BRACKET

FLUE
HOOD

GAS SERVICE COCK
(SHOWN OFF)

UNION NUT

4287

4289

4288

5 Boiler Installation

Advertising