Installation – Glow-worm Ultracom2 cxi User Manual

Page 15

Advertising
background image

0020112601_02 - 10/12 - Glow-worm

- 13 -

INSTALLATION

Flue hole cutting

• Mark the position of the flue centre.

• Remove the wall template, then drill the flue hole.

i

The flue is designed with an internal fall of 44mm/

metre (2.5

o

), therefore the hole can be drilled

horizontally.

• Use a 105mm diameter core drill for external access flue

installation (60/100 flue) (80/125 flue ► Ø130mm).

• Use a 125mm diameter core drill for internal access only flue

installation (60/100 flue) (80/125 flue ► Ø150mm).

i

If flue extension pipes are to be used then a core

drill size of 125mm is required. This will allow the

extension pieces to slope at 44mm/metre (2.5

o

)

towards the boiler.

• If fitting a side flue, extend the flue centre line into the corner

then 130mm along the adjacent wall.

• If fitting an extended side flue, determine the flue hole centre

by extending the dashed inclined line on the template to the

side wall. This dashed line is drawn at 44mm/metre (2.5

o

)

rise from the boiler. Where this line reaches the side wall, a

horizontal line should be marked. The vertical centre line of

the flue should then be marked at 130mm from the back wall.

To allow for the flue passing through the wall at this angle

a 125mm hole should be drilled irrespective of internal or

external installation.

Hanging bracket fixing

Due to the varied site conditions, fixings are not supplied and

advise that the installer should supply those which are suitable.

• Drill the holes for the fixing screws in accordance with the

wall template.

• Fix the hanging bracket on the wall.

7.4.2

boiler hanging

a

With regards to the Manual Handling Operations,

1992 Regulations, the following lift operation

exceeds the recommended weight for a one

person lift, refer to chapter "Manual Handling".

2

1

Key

1 boiler

2 Hanging bracket

• Lifting the boiler into position, lean the top of the boiler

slightly to the wall and position just above the hanging

bracket.

• Lower the boiler slowly and engage onto the hanging bracket

8 Hydraulic connection

8.1

Gas and water connections

The whole of the gas installation, including the meter, should

be inspected, tested for tightness and purged in accordance

with the current issue of BS6891 and in IE the current edition of

I.S.813 “Domestic Gas Installations”.

i

The appliance may contain a small amount of water,

place a water container beneath the boiler connections.

• Take care to clean the pipes before assembly removing any

debris or burrs. Grease and oils may need to be removed

they are not possible to remove by cleansing and flushing.

Foreign bodies in the system may enter the appliance and

interrupt its operation.

• Do not use any solvent products, due to the risk of damaging

the circuit.

a

Do not perform any 'hot work' directly under

the appliance, this may cause damage to the

appliance base. Heat may also damage the

isolation valves.

Always pre-solder pipes before fitting them to

the boiler.

Advertising