Maintenance – Glow-worm Ultracom2 cxi User Manual

Page 49

Advertising
background image

0020112601_02 - 10/12 - Glow-worm

- 47 -

MAINTENANCE

19.3.1

Expansion vessel

1

4

1

2

3

2

A

E

C

B

D

Key

1 Connector

2 Expansion vessel

3 Upper support bracket

4 Retaining screw

5 Gasket

Drain the boiler heating circuit as described in the appropriate

chapter "Draining".

• Remove the two screws (4).

• Undo the connector (1) at the base of the vessel.

• Remove upper support bracket (3).

• Remove the expansion vessel (2).

• Fit a new gasket between the expansion vessel and

connector.

• Refill, vent and pressurise the boiler.

Advertising