Service line requirements, Space requirements, Your next step – Labconco Protector Stainless Steel Radioisotope Laboratory Fume Hoods 9682200 User Manual

Page 14

Advertising
background image

10

Product Service 1-800-522-7658

Chapter 2: Prerequisites

Service Line Requirements

All service lines to the laboratory fume hood should be
¼ inch outside diameter, copper (brass for natural gas),
and equipped with an easily accessible shut-off valve,
should disconnection be required. If the service line
pressure exceeds 40 PSI, it must be equipped with a
pressure regulator to reduce the line pressure.

Space Requirements

The dimensions for the different models are shown in
Appendix B: Protector Radioisotope Hood Dimensions.

Your Next Step

After you have determined that the location you have
selected accommodates the installation and operational
requirements of your fume hood, you are ready to begin
installation. Proceed to Chapter 3: Getting Started.

Advertising